Trade 100amps for200.
200 amps, with room for a charger, heat pump and range.
What the swap includes
Load calculation
We add up what you run now and what you plan to add next.
New panel
Sized to the load, with open spaces left for later.
Permit and inspection
Filed with your city. We meet the inspector.
Labeled map
Every breaker named, a printed map inside the door.
40 ampsfor one car.
A Level 2 charger can want a 40 or 60 amp breaker on its own. Older panels often run out of room first.
Asked at every walkthrough
- Will the power be off?
- Yes, for part of one day. You get the window ahead of time.
- Do I need a permit?
- Yes. We file it and meet the inspector.
- Can I finance it?
- Financing is available. Ask at the walkthrough.
Book the walkthrough
Monday to Friday 7 AM to 6 PM, Saturday 8 AM to 2 PM. We quote at your house, in writing.
Book a panel upgrade walkthrough